Naegle Road Lift Station Elimination

Concrete utility covers and pipes by a residential street.
Electrical box and pipes near a road with houses and trees in the background.
Road ending at grass with trees and houses nearby under a blue sky.

Bayer Becker is currently under contract with the Clermont County Water Resources Department to prepare the design and contract documents to eliminate the Naegele Road lift station. The project includes extension of 111’ of 8” gravity sewer main, transfer of flow from the lift station to the new gravity sewer, demolition of the existing lift station, and abandonment of the existing force main. Bayer Becker engineers developed a specification section to address the unique aspects of the lift station demolition including instructions for removal of the electric service, salvage of equipment, disposal of sewage, and treatment of the existing concrete wet well and valve vault.

Client
Clermont County Water Resources
Location
Pierce Twp , OH , Clermont County
Size
111 LF

More Featured Projects

Brown dog standing on grass at a busy dog park.
The City of Erlanger’s Eons Adventure Park is a transformative effort to...
Aerial view of a park with winding paths and trees.
The Kenton County Legacy Park project represents a transformative investment in the...
Master plan layout with pools, courts, and green spaces.
The Oakwood Parks Improvement project is focused on renewing key community recreation...