Robert J. Barth Lake Park
Bayer Becker collaborated with the City of Cold Spring staff to design a new park bound by commercial development, multifamily residences, and single-family homes. The central park feature is a 2.5 acre detention basin that showed signs of deterioration. The goal was to stabilize the existing banks while providing a community asset to support the surrounding neighborhood. The master plan included bank stabilization strategies, a phased planting plan, a walking trail with benches, a pedestrian bridge, a gazebo, and viewing areas. Bayer Becker provided the design and construction documents for the park.
Client
City of Cold Spring, KY
Location
Cold Spring
,
KY
,
Campbell County
Size
2.5 acres
Market
Services
More Featured Projects
Civic
Urban
OH
The $264 million renovation of the iconic convention center reimagines the 10.7-acre...
Parks & Recreation
OH
The Pat Beck & June Rininger Memorial Park, located within a designated...
Roadway Infrastructure
Traffic Infrastructure
OH
The project involved extending Ivy Pointe Boulevard approximately 2,500 feet from a...