Project Stats
Client
MKSK
Location Oxford, OH
Year
2018
Market
Size 173.00 Acres
Download this project's PDF

Services Provided:

  • GEOVISUALIZATION SERVICES

    • Orthophotography
  • SURVEYING SERVICES

    • Topographic Surveys
  • TRANSPORTATION ENGINEERING SERVICES

    • Safety Studies
    • Traffic Impact Studies
    • Traffic Signal Design

Interested in learning more?

Contact Us Now

Project Highlight

In 2017, MKSK and Bayer Becker teamed up to help redefine the eastern and southern gateways into the Miami University campus and the City of Oxford which incorporated improvements for multi-modal transportation users (vehicular, pedestrian, bicycle), safety, roadway lighting, access, signal modifications, drainage, and landscape architecture services.  

Specifically, Bayer Becker provided surveying and civil and transportation engineering services for Phase One of the project which included improvements to Patterson Avenue (US 27) from south of E. Spring Street to Chestnut Street and improvements to Oxford Trenton Road (SR 73) from Patterson Avenue (US 27) to Four Mile Creek.  Bayer Becker performed a topographic survey of the project area using traditional surveying methods and a small unmanned aircraft system (sUAS).  The sUAS was also utilized to capture orthophotos, point clouds, and still photos.  Roadway plans, drainage design, traffic control, maintenance of traffic, signalization plans and details were prepared by Bayer Becker.  Along Oxford Trenton Road (SR 73), a bike lane was added to each direction of travel.

Phase Two of the Miami University Gateways project is to consist of additional roadway and safety improvements as well as landscape architecture along the E. High Street (US 27) corridor from S. Campus Avenue to Patterson Avenue (US 27).  Bayer Becker prepared a Safety Application for the E. High Street project (ODOT project name BUT-27-15.70 to 16.25) which was ultimately awarded funding by the Ohio Department of Transportation.  MKSK and Bayer Becker are getting started on the survey and design work for Phase Two which involves the consolidation of several mid-block crosswalks, the installation of high visibility crosswalks, and the conversion of a center two-way left turn lane on E. High Street (US 27) to a raised landscaped median, except where dedicated left turn lanes are to remain at S. Campus Avenue, University Avenue, Tallawanda Road, and Patterson Avenue (US 27).

Get In Touch With Us

  • NORTHERN KENTUCKY   (859) 261-1113
    209 Grandview Drive
    Fort Mitchell, Kentucky  41017
  • MASON   (513) 336-6600
    6900 Tylersville Road Suite A
    Mason, Ohio  45040
  • OXFORD   (513) 523-4270
    110 South College Avenue Suite 101
    Oxford, Ohio  45056
  • CINCINNATI   (513) 834-6151
    1404 Race Street Suite 204
    Cincinnati, Ohio  45202