Project Stats
Client
CR Architecture + Design
Location Oxford, OH
Year
2016
Market
Size 0.00

Services Provided:

  • CONSTRUCTION PHASE SERVICES

    • Change Order Review & Recommendation
    • Punchlist & Closeout
    • Regular Site Visitation
    • Shop Drawing Review
  • SURVEYING SERVICES

    • ALTA Surveys
    • Boundary Surveys
  • CIVIL ENGINEERING SERVICES

    • Contract Documents and Specifications
    • Erosion Control Planning, Permitting & Inspection
    • Grading & Earthwork Analysis
    • Hydrologic & Hydraulic Analysis
    • Site Development
    • Storm Water Collection System
    • Street Reconstruction
    • Structural Site Amenities
    • Waste Water Collection System
    • Waste Water Infrastructure
  • TRANSPORTATION ENGINEERING SERVICES

    • Maintenance of Traffic Plans
    • Pedestrian-Bicycle Facility Design
  • LANDSCAPE ARCHITECTURE & PLANNING SERVICES

    • Community and Urban Design
    • Contract Documents and Specifications
    • Market Graphics
    • Planting Plans
    • Site Furnishing Selection
    • Site Planning
    • Urban and Streetscape Design

Interested in learning more?

Contact Us Now

Project Highlight

The construction of the new Presidents Hall in Miami University’s North Quad began with the demolition of the existing tennis courts. The new residential hall was constructed on this site, just north of the baseball field. Bayer Becker provided integrated surveying and civil engineering services for the design-build contractor and architect. 
Bayer Becker knows the Oxford campus well, with an office less than a mile from campus for over ten years. Our team used this extensive experience to seamlessly blend the new Presidents Hall into the existing campus. Despite the extensive demolition and new construction, the Bayer Becker team was able to save the large historic sycamore tree between Presidents Hall and Hepburn Hall, providing a central gathering space for students. The site and utility improvements were integrated with the larger North Quad Renovation project, of which Bayer Becker was also a design team member. This project achieved LEED Silver certification.
 

Get In Touch With Us

  • CINCINNATI   (513) 834-6151
    1404 Race Street Suite 204
    Cincinnati, Ohio  45202
  • INDIANAPOLIS   (317) 207-1979
    1060 North Capitol Ave Office 15
    Indianapolis, IN  46204
  • MASON   (513) 336-6600
    6900 Tylersville Road Suite A
    Mason, Ohio  45040
  • NORTHERN KENTUCKY   (859) 261-1113
    209 Grandview Drive
    Fort Mitchell, Kentucky  41017
  • OXFORD   (513) 523-4270
    110 South College Avenue Suite 101
    Oxford, Ohio  45056