Project Stats
Client
The Stratford Companies
Location Cincinnati, OH
Year
2007
Market
Size 21.00 Acres

Services Provided:

  • SURVEYING SERVICES

    • ALTA Surveys
    • Boundary Surveys
    • Construction Layout & Staking
    • Easement Exhibits & Descriptions
    • GPS Control Surveys
    • Legal Descriptions
    • Location Surveys
    • Record Plans
    • Topographic Surveys
  • CIVIL ENGINEERING SERVICES

    • Grading & Earthwork Analysis
    • Storm Water Collection System
    • Storm Water Control Facilities
    • Storm Water Pollution Prevention Plans
    • Waste Water Collection System
    • Waste Water Infrastructure
  • TRANSPORTATION ENGINEERING SERVICES

    • Sight Distance Studies
    • Traffic Impact Studies
  • LANDSCAPE ARCHITECTURE & PLANNING SERVICES

    • Public Participation Facilitation
    • Site Planning
    • Zoning consultation

Interested in learning more?

Contact Us Now

Project Highlight

Considering the site chosen for The Kenwood by Senior Star it was almost as if someone was testing Bayer Becker’s design capabilities. The existing topography for The Kenwood by Senior Star consisted of unstable soil conditions and extremely steep hillsides. Because the building was designed to fit into the hillside, site design was critical. In addition to the actual design, Bayer Becker’s past experience with challenging topography helped lower overall costs and facilitate the Hillside Review Process with the City of Cincinnati. In addition to the topography, Bayer Becker worked to secure FAA approval for the project. FAA approval was required because the tower cranes used during construction extended into nearby Lunken Airport’s airspace.

One of our responsibilities as design professionals is controlling costs where we can and saving time for our clients. Bayer Becker was able to do both, by providing MEP building layout services for the project. During the course of construction, Bayer Becker survey crews used a combination of robotic and GPS technology to successfully lay out over 5000 points on the 18 story high-rise. The points assisted the plumbing and HVAC contractors installing utilities through the post-tensioned decks before the concrete was poured, reducing the amount of time needed between pours by two days per floor. Bayer Becker’s flexible design due to value engineering in conjunction with the General Contractor and the owner’s programming changes also assisted with the tight project schedule.

As part of our project design services, Bayer Becker served as a liaison, coordinating design services with the out of town architect, MEP consultants and the General Contractor helping the project finish on time.

Get In Touch With Us

  • CINCINNATI   (513) 834-6151
    1404 Race Street Suite 204
    Cincinnati, Ohio  45202
  • INDIANAPOLIS   (317) 207-1979
    1060 North Capitol Ave Office 15
    Indianapolis, IN  46204
  • MASON   (513) 336-6600
    6900 Tylersville Road Suite A
    Mason, Ohio  45040
  • NORTHERN KENTUCKY   (859) 261-1113
    209 Grandview Drive
    Fort Mitchell, Kentucky  41017
  • OXFORD   (513) 523-4270
    110 South College Avenue Suite 101
    Oxford, Ohio  45056