Project Stats
Client
Molasky Group of Companies
Location Sycamore Township, OH
Year
2010
Market
Size 6.00 Acres

Services Provided:

  • CIVIL ENGINEERING SERVICES

    • Construction Administration
    • Erosion Control Planning, Permitting & Inspection
    • Grading & Earthwork Analysis
    • Storm Water Collection System
    • Storm Water Control Facilities
    • Storm Water Pollution Prevention Plans
    • Waste Water Collection System
  • LANDSCAPE ARCHITECTURE & PLANNING SERVICES

    • Contract Documents and Specifications
    • Irrigation Plans
    • Planting Plans
    • Sustainable Design and LEED Certification
    • Zoning consultation

Interested in learning more?

Contact Us Now

Project Highlight

As part of a nationwide facility improvement program- the Federal Government, through the General Services Administration (GSA), was looking to relocate the Cincinnati FBI field office from its cramped existing office in downtown Cincinnati, to a state-of-the-art facility with room for future expansion.

The Molasky Group from Las Vegas, Nevada was chosen to build the new field office and subsequently lease it back to the GSA. The Molasky Group chose Bayer Becker to provide a wide range of services on the project- beginning with due diligence, progressing into development drawings, and ultimately providing detailed construction drawings for the civil site work, landscaping , irrigation plans and LEED documentation. The FBI Field Office received LEED Gold Certification.

The site chosen for the new field office was a challenge due to the proximity of existing residential lots. The site was bounded on two sides by established neighborhoods. Getting the support of the surrounding residents for project was an important key in obtaining approval at the Township Zoning level. Bayer Becker assisted in coordinating open-house style public meetings with neighboring residential property owners to build public support for the development.

Bayer Becker also provided construction administration for the project. Weekly team meetings were held to maintain the project’s tight schedule, shop drawings were reviewed, and all site and landscaping questions for the contractor were handled in a timely fashion. Bayer Becker performed a final site inspection and site punch list for the contractor to address before the building would be turned over to the owner.

The project was a success in the eyes of the developer, the township, and surrounding residents. Bayer Becker’s role in the project was an important part of the overall success of the project- starting at the early conceptual phases and continuing until the site was complete and occupied by the new tenant.


 

Get In Touch With Us

  • CINCINNATI   (513) 834-6151
    1404 Race Street Suite 204
    Cincinnati, Ohio  45202
  • INDIANAPOLIS   (317) 207-1979
    1060 North Capitol Ave Office 15
    Indianapolis, IN  46204
  • MASON   (513) 336-6600
    6900 Tylersville Road Suite A
    Mason, Ohio  45040
  • NORTHERN KENTUCKY   (859) 261-1113
    209 Grandview Drive
    Fort Mitchell, Kentucky  41017
  • OXFORD   (513) 523-4270
    110 South College Avenue Suite 101
    Oxford, Ohio  45056