Project Stats
Client
City of Park Hills
Location ,
Year
2022
Market
Size 0.00

Interested in learning more?

Contact Us Now

Project Highlight

Bayer Becker provided public involvement, surveying, sidewalk design, utility coordination, and right of way plans/easement document preparation for the St. Joseph Lane sidewalk project for the City of Park Hills.  


The project involved the addition of sidewalk along one side of the existing two-lane local roadway. Where possible and when needed for utility coordination, a tree lawn was positioned between the existing back of curb and the proposed walk. Driveways were reconstructed when acceptable ADA cross slopes were not already provided.


Due to existing grades, modification to a run of sanitary sewer was necessary and some extended curb areas were needed to accommodate the sidewalk.  While the improvements limited or minimized the impacts to adjacent property owners, temporary construction easements were ultimately required along 3 properties.  


The age of the neighborhood/homes located along St. Joseph Lane required the completion of a Section 106 review, performed by KYTC with Bayer Becker’s assistance.  And to meet public involvement requirements, Bayer Becker presented the project at a City Council Meeting. 


Funding for the St. Joseph Lane sidewalk project was received from the Federal Highway Administration.  Bayer Becker provided construction administration services during  construction, leading the inspection team.
 

Get In Touch With Us

  • CINCINNATI   (513) 834-6151
    1404 Race Street Suite 204
    Cincinnati, Ohio  45202
  • INDIANAPOLIS   (317) 207-1979
    1060 North Capitol Ave Office 15
    Indianapolis, IN  46204
  • MASON   (513) 336-6600
    6900 Tylersville Road Suite A
    Mason, Ohio  45040
  • NORTHERN KENTUCKY   (859) 261-1113
    209 Grandview Drive
    Fort Mitchell, Kentucky  41017
  • OXFORD   (513) 523-4270
    110 South College Avenue Suite 101
    Oxford, Ohio  45056