Project Stats
Client
Miami Township Board of Trustees
Location Miami Township, OH
Year
2013
Market
Size 19.00 Acres

Services Provided:

  • CONSTRUCTION PHASE SERVICES

    • Bidding Assistance
    • Change Order Review & Recommendation
    • Construction Document Conformance Verification
    • Field Records & Reporting
    • Meeting Document Preparation
    • Meeting Facilitation
    • Owner Representation
  • SURVEYING SERVICES

    • Boundary Surveys
    • Easement Exhibits & Descriptions
    • FEMA Elevation Certificates
    • Legal Descriptions
    • Topographic Surveys
  • CIVIL ENGINEERING SERVICES

    • Erosion Control Planning, Permitting & Inspection
    • Grading & Earthwork Analysis
    • Site Development
    • Storm Water Collection System
  • LANDSCAPE ARCHITECTURE & PLANNING SERVICES

    • Contract Documents and Specifications
    • Design Standards and Guidelines
    • Due Diligence Research
    • Irrigation Plans
    • Lighting Plans
    • Market Graphics
    • Master Planning
    • Park and Recreation Planning and Design
    • Planting Plans
    • Preliminary Budgeting - Final Cost Estimating
    • Site Furnishing Selection
    • Site Planning

Interested in learning more?

Contact Us Now

Project Highlight

Bayer Becker’s full array of design capabilities will be utilized for Miami Township’s newest park including landscape architecture, civil engineering and surveying. The park is located along the Great Miami River in Cleves, Ohio and will feature multiple athletic fields, tennis courts, a dog park, a playground, park shelters, a concession stand, restrooms and a shared use trail that runs around the perimeter of the park.

Bayer Becker worked alongside the Trustees throughout the conceptual phase. Prior to design, Bayer Becker conducted a meeting with the Township trustees to establish a project schedule, identify any potential challenges and verify the project deliverables. Immediately after the meeting Bayer Becker and the trustees walked the site to document the existing conditions. This cooperation also included a design workshop, led by Bayer Becker that helped direct the park’s design. Elements discussed included vehicular and pedestrian circulation, services for the park including concession and restrooms, and the types of recreation facilities the Trustees desired. Based on these discussions concepts for the park were generated.

In addition to design Bayer Becker provided a review of the master plan’s design elements and identified elements that could be funded from non- Township funding sources and suggested any changes in the design that may improve chances for alternative funding. Bayer Becker also researched various for profit and non-profit local, state, federal programs and funding sources for appropriate elements of the development plan.

Get In Touch With Us

  • CINCINNATI   (513) 834-6151
    1404 Race Street Suite 204
    Cincinnati, Ohio  45202
  • INDIANAPOLIS   (317) 207-1979
    1060 North Capitol Ave Office 15
    Indianapolis, IN  46204
  • MASON   (513) 336-6600
    6900 Tylersville Road Suite A
    Mason, Ohio  45040
  • NORTHERN KENTUCKY   (859) 261-1113
    209 Grandview Drive
    Fort Mitchell, Kentucky  41017
  • OXFORD   (513) 523-4270
    110 South College Avenue Suite 101
    Oxford, Ohio  45056